WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
Este Cmap, tiene informaciĆ³n relacionada con: Contingencies, Security Coordinator constantly monitors Transmission system, Deviation From Buss Voltage Limits requires Bringing other Plants Online, Anticipation of peak load is called "Staying ahead of the load", Interface problems can lead to Voltage problems, Voltage problems e.g., Deviation From Buss Voltage Limits, Contingencies involve coping with Shortfalls in generation, "Staying ahead of the load" means Always being prepared for the next 1000MW, Interface problems involve Duke, Contingencies are handled by Security Coordinator, Voltage problems e.g., Collapse, Security Coordinator constantly monitors Interfaces, Contingencies involve coping with High Level of Mental Workload, High Level of Mental Workload does not necesarily entail High Level of Stress, Rapid Changes in Demand mandate Monitoring the Resources Needed at Peak, Rapid Changes in Demand lead to High Level of Mental Workload, Losses e.g., Generating Units, High Level of Mental Workload depends on Reserve, "Staying ahead of the load" e.g., It can take up to 2 hours for power to come to cost, Interface problems involve TVA, Voltage problems e.g., Surge