WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Product feed and pumps, Product pumps (M2 / M4) Controls M2 and M4 are “PID” controlled based on FC004, you are able to monitor M2 and M4’s speed control on FC004’s PID control screen., Regulatory (Legal Flow) Functionality FC04 is a magnetic flowmeter measuring the system continuous flow, BTD1 level control (V8, LT08) Functionality Constant feed to M2pump, Product feed and pumps Product Feed BTD1 CIP sprayball supply (V05), Inlet valve cluster (V13.1, V13.2, V14, V15) Functionality V15 is used during product supply line fill, assure product is primed, Product feed and pumps Product Feed Product pumps (M2 / M4), Product pumps (M2 / M4) Functionality M2 and M4 work together on a % ratio control set-up in the PLC programming to maintain flow based on FC004, BTD1 level control (V8, LT08) Control Inlet valve, V08 is PID controlled based on level transmitter, LC08, Inlet valve cluster (V13.1, V13.2, V14, V15) Controls BTD level and specific steps dictate when V13.1 activates, Product pumps (M2 / M4) Purpose Continuous flow feed through VTIS up to the flash vessel, Inlet valve cluster (V13.1, V13.2, V14, V15) Purpose Manages water and product supplies, Product feed and pumps Product Feed Regulatory (Legal Flow), Inlet valve cluster (V13.1, V13.2, V14, V15) Controls BTD level and specific steps dictate when V14 activates, BTD1 CIP sprayball supply (V05) Functionality Activates in CIP to clean BTD1, BTD1 CIP sprayball supply (V05) Purpose CIP of BTD1, BTD1 CIP sprayball supply (V05) Controls On/Off solenoid function based on program activation, Product pumps (M2 / M4) Purpose Maintains VTIS designed flowrate, Regulatory (Legal Flow) Controls FC04 signal, goes to a legal recorder, in which the min and max flow guards are monitored to generate a “Flow OK” signal., Product pumps (M2 / M4) Functionality M2 supplying adequate inlet pressure to M4 and through pre-heater section of main heat exchanger, Regulatory (Legal Flow) PMO PMO guard is > 10GPM < max calculated flow